Downloads
User Manuals and Guides
MTinfo 3000 SIL4 Cloud Control System
Rail Safety Track Access Protection and Blocking Devices
If you would like access to any of the User Manuals below, email us at info@dualinventive.com
- RDI 3000 User Manual
- RDI 3000 Quick Start
- RSS 3000 User Manual
- ZKL 3000 RC User Manual
- ZKL 3000 RC Quick Start
- ZKL 3000 User Manual
Rail Safety Warning Devices
- Manual DUM 3000 (currently not available in English)
- Manual DUU 3000 ( currently not available in English)
- Manual WUM 3000 ( currently not available in English)
Insight Business Information System
- Manual Insight app (currently not available in English)
- Manual Insight web (the latest manual available in Insight)
Intelligent Rail Infrastructure Sensors
- Manual CRM 3000
Device Accessories
- Quick Start BBX 3000
- Manual Solar NRG 3000 ( currently not available in English )
- Solar NRG 3000 installation upgrade guide (available on request, email info@dualilnventive.com)
Product Information
ZKL 3000 RC Training Videos
- How to perform the pre-use tests on the ZKL 3000 RC before deployment
- How to install a ZKL 3000 RC
- How to install the ballast box (BBX 3000) and solar panel
- How to operate the ZKL 3000 RC manually
- How to operate the ZKL 3000 RC remotely
Dual Inventive Virtual Rail Platform
Windows
MAC
Certificates
Products
If you need access to any of the Certificates of Approval, please get in touch email info@dualinventive.com
- ZKL 3000 RC and RS 3000 (RC) Full Certificate of Acceptance PA05/05043
- RSS 3000 Certificate of Acceptance Network Rail PA05/07874
- CRM 3000/CRTM 3000 Certificate of Acceptance Network Rail PA05-05415 ( Issue 3 )
- RDI 3000 Certificate DEKRA Rail
- ZKL 3000 Certificate Plurel
- ZKL 3000 Certificate of Acceptance T-COD Network Rail PA05-03898
- ZKL 3000/ZKL 3000 RC/ZKL 3000 RC-C Certificate Infrabel – Belgorail
- ZKL 3000/ZKL 3000 RC Metro Trains Melbourne Full Type Approval MTM-FTA-00083
- ZKL 3000 RC v.2 Certificate DEKRA Rail – railAlert
- ZKL 3000 RC v.3 Certificate DEKRA Rail – railAlert
- ZKL 3000 RC v.3 Authorisation form SNCF Réseau
- ZKL 3000 RC-C Safety statement Infrabel
ISO